eztv.tf | eztvstatus.org
Search title:  
TV Packs only
 

Bob Ross The Joy of Painting S23E07 At Dawns Light 480p x264-mSD EZTV

Episode Breakdown
The Joy of Painting with Nicholas Hankins
The Joy of Painting with Nicholas Hankins TV Show S23E07

Season: 23
Episode: 7
Download Links
     Torrent Download     Magnet Download
     Anonymous Download
Added 6 months ago by eztv (verified).
Tracker Statistics
Seeds: 0
Peers: 0
Stats generated @ 02:53 on 16th Feb 2026
Torrent Info
Torrent File: Bob.Ross.The.Joy.of.Painting.S23E07.At.Dawns.Light.480p.x264-mSD[EZTVx.to].mkv
Torrent Hash: 4D58C73DC548C1989F9752379BA23D403C3F4516
Filesize: 105 MB
Released: 12th Aug 2025

File Format: MKV (Matroska)
Resolution: 720x404 px
Aspect Ratio: 16:9
Alternate Releases S L
Bob Ross The Joy of Painting S23E07 At Dawns Light 720p WEB h264-BOBROSS 14 1
Bob Ross The Joy of Painting S23E07 At Dawns Light 720p HEVC x265-MeGusta 1 1
Bob Ross The Joy of Painting S23E07 At Dawns Light XviD-AFG 0 0
Bob Ross The Joy of Painting S23E07 At Dawns Light 1080p HEVC x265-MeGusta 4 1
image unavailable

The Joy of Painting with Nicholas Hankins S23E7 Screenshot
Bob.Ross.The.Joy.of.Painting.S23E07.At.Dawns.Light.480p.x264-mSD

Bob.Ross.The.Joy.of.Painting.S23E07.At.Dawns.Light.480p.x264-mSD.mkv

General Information

Duration          : 00:27:44
Release size      : 104 MB
Frame rate        : 50.000 Fps  
Video resolution  : 640x480  (16:9)


Extra infos
Format: Matroska / WebM
Encoder: Lavf61.5.101

Video info

Frame rate: 50/1
Codec name: H.264 / AVC / MPEG-4 AVC / MPEG-4 part 10
Codec type: video
Codec height: 480
Codec width: 640
Display ratio: 16:9
Pixel format: yuv420p
Profile: High
Audio info

Channel layout: stereo
Codec name: aac
Codec type: audio
Sample rate: 48000





ssl  EZTV RSS EZTV Status | EZTV API | upload Upload | DMCA: [email protected]